Change Language: 
      Deutsch
    
      Dansk
    
      English (UK)
    English (US) 
      Español
    
      Française
    עברית (ישראל) 
      Dutch
    
      Türkçe

New Equipment Spotlight: New Furnace at Alunorf Features Mass Flow Capability

$5.00

Product Information

Author:

Company:

Issue#: Vol. 69, No. 4

Year: 2011

Pages: 1


Summary: Alunorf, the joint venture between Hydro and Novelis in Neuss, Germany, added a new remelt facility alongside its existing rolling mill in 2009. The new recycling center's first furnace order was for a LOI twin-chamber melting furnace along with ancillaries. An order for a second LOI twin-chamber furnace was made and is expected to be operational in 2011. Both furnaces supplied by LOI Thermprocess GmbH feature ancillary melt technologies from Pyrotek. The ancillaries, including two 6" EMP pump systems with a Low Turbulence Scrap Submergence (LOTUSS) vortex chargewell, are described within the article. 

 

 

Product Code: NEWC2

 

Mobile Site

eCommerce by CubeCart